$850 Billion, 1588 pages, and counting... somebody needs to read it!

Final Version

PDF | TXT
Passed in House on 2/13 246-183
roll-call vote
 YesNo
Democrats2467
Republicans0176

Passed in Senate on 2/13 60-38
roll-call vote
 YesNo
Democrats570
Republicans338

Senate "Compromise" (2/7)

PDF | TXT


1/23 Senate Tax Staff Sum. » PDF | TXT
1/23 Senate Tax Prov Anal. » PDF | TXT
1/23 Senate Chairman's Mark Tax » PDF | TXT
1/23 Senate Chairman's Mark Health» PDF | TXT











back
H.R. 1: Final Stimulus Version
prev     Page 31     next

—SEC. 406. RENEWABLE ENERGY AND ELECTRIC POWER TRANSMISSION LOAN GUARANTEE PROGRAM. (a) AMENDMENT.—Title XVII of the Energy Policy Act of 2005 (42 U.S.C. 16511 et seq.) is amended by adding the following at the end: ‘‘SEC. 1705. TEMPORARY PROGRAM FOR RAPID DEPLOYMENT OF RENEWABLE ENERGY AND ELECTRIC POWER TRANSMISSION PROJECTS. ‘‘(a) IN GENERAL.—Notwithstanding section 1703, the Secretary may make guarantees under this section only for the following categories of projects that commence construction not later than September 30, 2011: ‘‘(1) Renewable energy systems, including incremental hydropower, that generate electricity or thermal energy, and facilities that manufacture related components. ‘‘(2) Electric power transmission systems, including upgrading and reconductoring projects. ‘‘(3) Leading edge biofuel projects that will use technologies performing at the pilot or demonstration scale that the Secretary determines are likely to become commercial technologies and will produce transportation fuels that substantially reduce life-cycle greenhouse gas emissions compared to other transportation fuels. ‘‘(b) FACTORS RELATING TO ELECTRIC POWER TRANSMISSION SYS-TEMS.—In determining to make guarantees to projects described in subsection (a)(2), the Secretary may consider the following factors: ‘‘(1) The viability of the project without guarantees. ‘‘(2) The availability of other Federal and State incentives. ‘‘(3) The importance of the project in meeting reliability needs. ‘‘(4) The effect of the project in meeting a State or region’s environment (including climate change) and energy goals. ‘‘(c) WAGE RATE REQUIREMENTS.—The Secretary shall require that each recipient of support under this section provide reasonable assurance that all laborers and mechanics employed in the performance of the project for which the assistance is provided, including those employed by contractors or subcontractors, will be paid wages at rates not less than those prevailing on similar work in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of part A of subtitle II of title 40, United States Code (commonly referred to as the ‘Davis-Bacon Act’). ‘‘(d) LIMITATION.—Funding under this section for projects described in subsection (a)(3) shall not exceed $500,000,000. ‘‘(e) SUNSET.—The authority to enter into guarantees under this section shall expire on September 30, 2011.’’. (b) TABLE OF CONTENTS AMENDMENT.—The table of contents for the Energy Policy Act of 2005 is amended by inserting after the item relating to section 1704 the following new item: ‘‘Sec. 1705. Temporary program for rapid deployment of renewable energy and electric power transmission projects.’’. SEC. 407. WEATHERIZATION ASSISTANCE PROGRAM AMENDMENTS. (a) INCOME LEVEL.—Section 412(7) of the Energy Conservation and Production Act (42 U.S.C. 6862(7)) is amended by striking ‘‘150 percent’’ both places it appears and inserting ‘‘200 percent’’.


page image