$850 Billion, 1588 pages, and counting... somebody needs to read it!

Final Version

PDF | TXT
Passed in House on 2/13 246-183
roll-call vote
 YesNo
Democrats2467
Republicans0176

Passed in Senate on 2/13 60-38
roll-call vote
 YesNo
Democrats570
Republicans338

Senate "Compromise" (2/7)

PDF | TXT


1/23 Senate Tax Staff Sum. » PDF | TXT
1/23 Senate Tax Prov Anal. » PDF | TXT
1/23 Senate Chairman's Mark Tax » PDF | TXT
1/23 Senate Chairman's Mark Health» PDF | TXT











back
H.R. 1: Final Stimulus Version
prev     Page 32     next

—(b) ASSISTANCE LEVEL PER DWELLING UNIT.—Section 415(c)(1) of the Energy Conservation and Production Act (42 U.S.C. 6865(c)(1)) is amended by striking ‘‘$2,500’’ and inserting ‘‘$6,500’’. (c) EFFECTIVE USE OF FUNDS.—In providing funds made available by this Act for the Weatherization Assistance Program, the Secretary may encourage States to give priority to using such funds for the most cost-effective efficiency activities, which may include insulation of attics, if, in the Secretary’s view, such use of funds would increase the effectiveness of the program. (d) TRAINING AND TECHNICAL ASSISTANCE.—Section 416 of the Energy Conservation and Production Act (42 U.S.C. 6866) is amended by striking ‘‘10 percent’’ and inserting ‘‘up to 20 percent’’. (e) ASSISTANCE FOR PREVIOUSLY WEATHERIZED DWELLING UNITS.—Section 415(c)(2) of the Energy Conservation and Production Act (42 U.S.C. 6865(c)(2)) is amended by striking ‘‘September 30, 1979’’ and inserting ‘‘September 30, 1994’’. SEC. 408. TECHNICAL CORRECTIONS TO PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978. (a) Section 111(d) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2621(d)) is amended by redesignating paragraph (16) relating to consideration of smart grid investments (added by section 1307(a) of Public Law 110–140) as paragraph (18) and by redesignating paragraph (17) relating to smart grid information (added by section 1308(a) of Public Law 110–140) as paragraph (19). (b) Subsections (b) and (d) of section 112 of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 2622) are each amended by striking ‘‘(17) through (18)’’ in each place it appears and inserting ‘‘(16) through (19)’’. SEC. 409. RENEWABLE ELECTRICITY TRANSMISSION STUDY. In completing the 2009 National Electric Transmission Congestion Study, the Secretary of Energy shall include— (1) an analysis of the significant potential sources of renewable energy that are constrained in accessing appropriate market areas by lack of adequate transmission capacity; (2) an analysis of the reasons for failure to develop the adequate transmission capacity; (3) recommendations for achieving adequate transmission capacity; (4) an analysis of the extent to which legal challenges filed at the State and Federal level are delaying the construction of transmission necessary to access renewable energy; and (5) an explanation of assumptions and projections made in the Study, including— (A) assumptions and projections relating to energy efficiency improvements in each load center; (B) assumptions and projections regarding the location and type of projected new generation capacity; and (C) assumptions and projections regarding projected deployment of distributed generation infrastructure. SEC. 410. ADDITIONAL STATE ENERGY GRANTS. (a) IN GENERAL.—Amounts appropriated under the heading ‘‘Department of Energy—Energy Programs—Energy Efficiency and Renewable Energy’’ in this title shall be available to the Secretary of Energy for making additional grants under part D of title III of the Energy Policy and Conservation Act (42 U.S.C. 6321 et seq.). The Secretary shall make grants under this section in excess of the base allocation established for a State under regulations issued pursuant to the


page image